London Road Embankment

Settlement issues have been identified, and as a result, emergency speed restrictions were implemented along the route. The embankment supporting the railway was then monitored daily, observing significant movement(s).

Services provided
Proudly working with

Our approach

  1. Review and collateWe reviewed the available data and ground model to establish a design ground model to current UK guidance, using ‘characteristic’ material parameters.
  2. Slope analysis Undertake slope stability analysis of the existing slope, identifying likely failure mechanisms.
  3. Design options Design preliminary remedial options through to detailed and design of chosen solution.
  4. Design RecommendationsWe delivered detailed reports, including earthwork remedial recommendations and solutions.

Solum Saxum’s expertise enabled plausible engineering options to be tabled and discussed allowing a final design solution to be detailed and built to meet programme requirements safely.

The results

  • A flexible approach Our flexible working allowed design timeframes to align with a  strict design and build programme, which allowed the partnership to deliver the scheme as planned allowing the line to be re-opened at full speed on time. 
  • A future proof solution The solution stabilised the existing embankment preventing future failures.
  • Cost effective recommendations Recommendations that optimised construction, reducing costs by 10% while meeting safety standards.