Settlement issues have been identified, and as a result, emergency speed restrictions were implemented along the route. The embankment supporting the railway was then monitored daily, observing significant movement(s).
Solum Saxum’s expertise enabled plausible engineering options to be tabled and discussed allowing a final design solution to be detailed and built to meet programme requirements safely.